ALMA Technical Notes https://almascience.eso.org/documents-and-tools/alma-technical-notes-a-subset-of-documents-from-the-eoc-memo-series https://almascience.eso.org/@@site-logo/alma-logo-padded.png ALMA Technical Notes Technical Note # TitleAuthorRelease Date 1 Band-to-Band Phase Transfer with ALMA K. Scott 2013 May 27 2 Spectral Scan testing update C. Wilson 2014 Mar 30 3 Band 4 & 8 Imaging Verification Test Report T. Sakoto 2014 May 30 4 ObsMode Summary Report A. Remijan 2014 Jun 24 5 Proposed SV Targets for the Long Baseline Campaign - Additional Information EOC Management 2014 Jun 24 6 Performance of H Maser During the EOC Week - 29 July to 03 Aug A. Remijan 2014 Aug 03 7 The Effect of the Differential Antenna Height Term in the Delay Model E. Fomalont 2014 Jul 31 8 Technical Description and Implementation of Band to Band Phase Transfer E. Fomalont, V. Impellizzeri 2014 Aug 04 9 Preliminary Progress Report on the Implementation of the Bandwidth Transfer Technique for High Frequency Observations J. Donovan Meyer 2014 Aug 08 10 Progress on the Implementation of the Bandwidth Transfer Technique for High Frequency Observations - Report #2 B. Mason 2014 Sep 03 11 General Considerations and Observing Scenario for Bandwidth Switching Observing Mode B. Mason 2014 Sep 04 12 Preliminary Progress Report on the High Frequency Single-Dish Sideband Separation J. Chibueze 2014 Aug 12 13 Consideration to the Correction Factor for Single-Dish Observations with the ACA Correlator S. Kameno 2014 Oct 26 14 Preliminary summary of ACA Testing Campaign S. Kameno, T. Kamazaki 2014 Oct 17 15 ALMA Cross Correlation Bandpass Stability S. Kameno 2014 Dec 17 16 Summary of the First ALMA Phasing Project (APP) Commissioning and Science Verification Mission: 2015 January 6-13 L. D. Matthews, G. B. Crew 2015 March 29 17 Summary of the Second ALMA Phasing Project (APP) Commissioning and Science Verification Mission: 2015 March 24-30 L. D. Matthews, G. B. Crew 2015 Oct 28 18 Summary of the Third ALMA Phasing Project (APP) Commissioning and Science Verification Mission: 2015 July 28 - August 3 L. D. Matthews G. B. Crew 2015 Oct 28 19 Summary of the Fourth ALMA Phasing Project (APP) Commissioning and Science Verification Mission: 2016 April 3-8 L. D. Matthews, G. B. Crew, V. L. Fish 2017 March 28