You are here: Home / Observing / Configuration Schedule

Configuration Schedule

 Cycle 7 - by Block

BlockStart dateEnd datePurpose

Approx 
Config.

min - max
baseline
(m)

beam1
(")

maximum
recoverable
scale1
(")

1 2019-09-30 2019-10-07 PI (Observing Report) C43-4 15-784 0.92" 11.2"
2 2019-10-07 2019-10-14 PI (Observing Report) C43-4 15-784 0.92" 11.2"
3 2019-10-14 2019-10-21 PI (Observing Report) C43-4 15-784 0.92" 11.2"
4 2019-10-21 2019-10-28 PI (Observing Report) C43-3 15-500 1.4" 16.2"
5 2019-10-28 2019-11-04 PI (Observing Report) C43-3 15-500 1.4" 16.2"
6 2019-11-04 2019-11-11 PI (Observing Report) C43-3 15-500 1.4" 16.2"
2019-11-11 2019-11-18 PI (Observing Report) C43-3 15-500 1.4" 16.2"
8 2019-11-18 2019-11-25 PI (Observing Report) C43-2 15-314 2.3" 22.6"
9 2019-11-25 2019-12-02 PI (Observing Report) C43-2 15-314 2.3" 22.6"
10 2019-12-02 2019-12-09 PI (Observing Report) C43-1 15-161 3.4" 29.0"
11 2019-12-09 2019-12-16 PI (Observing Report) C43-1 15-161 3.4" 29.0"
12 2019-12-16 2019-12-23 PI (Observing Report) C43-1 15-161 3.4" 29.0"
13 2019-12-23 2019-12-30 PI (Observing Report) C43-2 15-314 2.3" 22.6"
14 2019-12-30 2020-01-06 PI (Observing Report) C43-2 15-314 2.3" 22.6"
15 2020-01-06 2020-01-13 PI (Observing Report) C43-2 15-314 2.3" 22.6"
16 2020-01-13 2020-01-20 PI (Observing Report) C43-3 15-500 1.4" 16.2"
17 2020-01-20 2020-01-27 PI (Observing Report) C43-3 15-500 1.4" 16.2"
22 2020-02-27 2020-03-03 PI (Observing Report) C43-3 15-500 1.4" 16.2"
23 2020-03-02 2020-03-09 PI (Observing Report) C43-4 15-784 0.92" 11.2"
24 2020-03-09 2020-03-16 PI (Observing Report) C43-4 15-784 0.92" 11.2"
25 2020-03-16 2020-03-19 PI (Observing Report) C43-4 15-784 0.92" 11.2"
2020-03-19 Observations halted due to COVID-19 pandemic
26 2021-03-16 2021-03-22 PI (Observing Report) C43-4/5      
27 2021-03-22 2021-03-29 PI (Observing Report) C43-4/5
28 2021-03-29 2021-04-05 PI (Observing Report) C43-4/5
29 2021-04-05 2021-04-12 PI (Observing Report) C43-4/5
30 2021-04-12 2021-04-19 PI (Observing Report) C43-4/5
31 2021-04-19 2021-04-26 PI (Observing Report) C43-4/5
32 2021-04-26 2021-05-03 PI (Observing Report) C43-4/5
33 2021-05-03 2021-05-10 PI (Observing Report) C43-4/5
34 2021-05-10 2021-05-17 PI (Observing Report) C43-6 15-2500 0.31" 4.1"
35 2021-05-17 2021-05-24 PI (Observing Report) C43-6 15-2500 0.31" 4.1"
36 2021-05-24 2021-05-31 PI (Observing Report) C43-6 15-2500 0.31" 4.1"
37 2021-05-31 2021-06-07 PI (Observing Report) C43-6 15-2500 0.31" 4.1"
38 2021-06-07 2021-06-14 PI (Observing Report) C43-6 15-2500 0.31" 4.1"
39 2021-06-14 2021-06-21 PI (Observing Report) C43-6 15-2500 0.31" 4.1"

 

1Note: the synthesized beam and maximum recoverable scale are tabulated for a frequency of 100 GHz. To calculate these quantities for a given frequency (measured in GHz), multiply the tabulated values by (100 / frequency).

2LBR = Long Baseline Reconfiguration. ACA and Total Power Observations only.

 

Complete Tentative Cycle 7 Configuration Schedule1

Start dateConfigmin - max
baseline
(m)
beam
(")1
maximum
recoverable
scale
(")1
2019-10-01 C43-4 15-784 0.92" 11.2"
2019-10-20 C43-3 15-500 1.4" 16.2"
2019-11-10 C43-2 15-314 2.3" 22.6"
2019-11-30 C43-1 15-161 3.4" 29.0"
2019-12-20 C43-2 15-314 2.3" 22.6"
2020-01-10 C43-3 15-500 1.4" 16.2"
2020-02-01 February Maintenance Period
2020-03-01 C43-4 15-784 0.92" 11.2"
2021-03-20 C43-4/5
   
2021-05-10 C43-6 15-2500 0.31" 4.1"
TBD C43-7 64-3600 0.21" 2.6"
TBD C43-8 110-8500 0.096" 1.4"
TBD C43-9 368-13900 0.057" 0.81"
TBD C43-10 244-16200 0.042" 0.50"
TBD C43-9 368-13900 0.057" 0.81"
TBD C43-8 110-8500 0.096" 1.4"

1NOTE: The Configuration Schedule is SUBJECT TO CHANGE.

 

Link to Cycle 7 - 9 Configuration Schedules

 

Link to Configuration Schedules From Prior Cycles