šŸ”

Science Highlight

Ā 

Ā 

More...
news!

Configuration Schedule

Cycle 11 - by Block

Block Start date End date Purpose

Approx
Config.

min - max
baseline
(m)

beam1
(")

maximum
recoverable
scale1
(")

01 2024-10-01 2024-10-07 PIĀ (Observing Report) C-3 15-500 1.4" 16.2"
02 2024-10-07 2024-10-14 PIĀ (Observing Report) C-3 15-500 1.4" 16.2"
03 2024-10-14 2024-10-21 PIĀ (Observing Report) C-3 15-500 1.4" 16.2"
04 2024-10-21 2024-10-28 PIĀ (Observing Report) C-2 15-314 2.3" 22.6"
05 2024-10-28 2024-11-04 PIĀ (Observing Report) C-2 15-314 2.3" 22.6"
06 2024-11-04 2024-11-11 PIĀ (Observing Report) C-2 15-314 2.3" 22.6"
07 2024-11-11 2024-11-18 PIĀ (Observing Report) C-1 15-161

3.4"

29.0"
08 2024-11-18 2024-11-25 PIĀ (Observing Report) C-1 15-161 3.4" 29.0"
09 2024-11-25 2024-12-02 PIĀ (Observing Report) C-2 15-161 3.4" 29.0"
10 2024-12-02 2024-12-09 PIĀ (Observing Report) C-2 15-314 2.3" 22.6"
11 2024-12-09 2024-12-16 PIĀ (Observing Report) C-2 15-314 2.3" 22.6"
12 2024-12-16 2024-12-23 PIĀ (Observing Report) C-3 15-314 2.3" 22.6"
13 2024-12-23 2024-12-30 PIĀ (Observing Report) C-3 15-500 1.4" 16.2"
14 2024-12-30 2025-01-06 PIĀ (Observing Report) C-3 15-500 1.4" 16.2"

1Note: the synthesized beam and maximum recoverable scale are tabulated for a frequency of 100 GHz. To calculate these quantities for a given frequency (measured in GHz), multiply the tabulated values by (100 / frequency).Ā 

2LBR = Long Baseline Reconfiguration. ACA and Total Power Observations only.

Ā 

Complete Tentative Cycle 11 Configuration Schedule1

Ā 

Start date Configuration Longest baseline LST: Best conditions
1-Oct-2024 C-3 0.50 km 22-10
25-Oct-2024 C-2 0.31 km 23-11
10-Nov-2024 C-1 0.16 km 1-13
25-Nov-2024 C-2 0.31 km 2-14
15-Dec-2024 C-3 0.50 km 4-15
10-Jan-2025 C-4 0.78 km 5-17
1-Feb-2025 No observations due to maintenance
1-Mar-2025 C-4 0.78 km 8-21
20-Mar-2025 C-5 1.4 km 9-23
25-Apr-2025 C-6 2.5 km 11-1
30-May-2025 C-7 3.6 km 13-3
20-Jun-2025 C-8 8.5 km 14-5
11-Jul-2025 C-9 13.9 km 16-6
30-Jul-2025 C-10 16.2 km 17-7
20-Aug-2025 C-9 13.9 km 19-8
10-Sep-2025 C-8 8.5 km 20-9
1NOTE: The Configuration Schedule is SUBJECT TO CHANGE.

Ā 

Link to Configuration Schedules From Prior Cycles