Configuration Schedule
Cycle 9 - by Block
Block | Start date | End date | Purpose |
Approx |
min - max |
beam1 |
maximum |
---|---|---|---|---|---|---|---|
01 | 2022-09-30 | 2022-10-10 | PI (Observing Report) | C-3 | 15-500 | 1.4" | 16.2" |
02 | 2022-10-10 | 2022-10-17 | PI (Observing Report) | C-3 | 15-500 | 1.4" | 16.2" |
03 | 2022-10-17 | 2022-10-24 | PI (Observing Report) | C-3 | 15-500 | 1.4" | 16.2" |
04 | 2022-10-24 | 2022-10-31 | PI (Observing Report) | C-2 | 15-314 | 2.3" | 22.6" |
11 | 2022-12-19 | 2022-12-26 | PI (Observing Report) | C-3 | 15-500 | 1.4" | 16.2" |
12 | 2022-12-26 | 2023-01-02 | PI (Observing Report) | C-3 | 15-500 | 1.4" | 16.2" |
13 | 2023-01-02 | 2023-01-09 | PI (Observing Report) | C-3 | 15-500 | 1.4" | 16.2" |
14 | 2023-01-09 | 2023-01-16 | PI (Observing Report) | C-4 | 15-784 | 0.92" | 11.2" |
15 | 2023-01-16 | 2023-01-23 | PI (Observing Report) | C-4 | 15-784 | 0.92" | 11.2" |
16 | 2023-01-23 | 2023-02-01 | PI (Observing Report) | C-4 | 15-784 | 0.92" | 11.2" |
17 | 2023-02-20 | 2023-02-27 | PI (Observing Report) | C-4 | 15-784 | 0.92" | 11.2" |
18 | 2023-02-27 | 2023-03-06 | PI (Observing Report) | C-4 | 15-784 | 0.92" | 11.2" |
19 | 2023-03-06 | 2023-03-13 | PI (Observing Report) | C-4 | 15-784 | 0.92" | 11.2" |
20 | 2023-03-13 | 2023-03-20 | PI (Observing Report) | C-4 | 15-784 | 0.92" | 11.2" |
21 | 2023-03-20 | 2023-03-27 | PI (Observing Report) | C-5 | 15-1400 | 0.54" | 6.7" |
22 | 2023-03-27 | 2023-04-03 | PI (Observing Report) | C-5 | 15-1400 | 0.54" | 6.7" |
23 | 2023-04-03 | 2023-04-10 | PI (Observing Report) | C-5 | 15-1400 | 0.54" | 6.7" |
24 | 2023-04-10 | 2023-04-17 | PI (Observing Report) | C-5 | 15-1400 | 0.54" | 6.7" |
25 | 2023-04-17 | 2023-04-24 | PI (Observing Report) | C-6 | 15-2500 | 0.31" | 4.1" |
26 | 2023-04-24 | 2023-05-01 | PI (Observing Report) | C-6 | 15-2500 | 0.31" | 4.1" |
27 | 2023-05-01 | 2023-05-08 | PI (Observing Report) | C-6 | 15-2500 | 0.31" | 4.1" |
28 | 2023-05-08 | 2023-05-15 | PI (Observing Report) | C-6 | 15-2500 | 0.31" | 4.1" |
29 | 2023-05-15 | 2023-05-22 | PI (Observing Report) | C-6 | 15-2500 | 0.31" | 4.1" |
30 | 2023-05-22 | 2023-05-29 | PI (Observing Report) | C-7 | 64-3600 | 0.21" | 2.6" |
31 | 2023-05-29 | 2023-06-05 | PI (Observing Report) | C-7 | 64-3600 | 0.21" | 2.6" |
32 | 2023-06-05 | 2023-06-12 | PI (Observing Report) | C-7 | 64-3600 | 0.21" | 2.6" |
33 | 2023-06-12 | 2023-06-19 | PI (Observing Report) | C-7 | 64-3600 | 0.21" | 2.6" |
34 | 2023-06-19 | 2023-06-26 | PI (Observing Report) | C-8 | 110-8500 | 0.096" | 1.4" |
35 | 2023-06-26 | 2023-07-03 | PI (Observing Report) | C-8 | 110-8500 | 0.096" | 1.4" |
36 | 2023-07-03 | 2023-07-10 | PI (Observing Report) | C-8 | 110-8500 | 0.096" | 1.4" |
1Note: the synthesized beam and maximum recoverable scale are tabulated for a frequency of 100 GHz. To calculate these quantities for a given frequency (measured in GHz), multiply the tabulated values by (100 / frequency).
2LBR = Long Baseline Reconfiguration. ACA and Total Power Observations only.
Complete Tentative Cycle 9 Configuration Schedule1
Start date | Config | min - max baseline (m) |
beam (")1 |
maximum recoverable scale (")1 |
---|---|---|---|---|
2022-10-01 | C-3 | 15-500 | 1.4" | 16.2" |
2022-10-20 | C-2 | 15-314 | 2.3" | 22.6" |
2022-11-10 | C-1 | 15-161 | 3.4" | 29.0" |
2022-11-30 | C-2 | 15-314 | 2.3" | 22.6" |
2022-12-20 | C-3 | 15-500 | 1.4" | 16.2" |
2023-01-10 | C-4 | 15-784 | 0.92" | 11.2" |
2023-02-01 | February Maintenance Period | |||
2023-03-01 | C-4 | 15-784 | 0.92" | 11.2" |
2023-03-20 | C-5 | 15-1400 | 0.54" | 6.7" |
2023-04-20 | C-6 | 15-2500 | 0.31" | 4.1" |
2023-05-20 | C-7 | 64-3600 | 0.21" | 2.6" |
2023-06-20 | C-8 | 110-8500 | 0.096" | 1.4" |
2023-07-11 | C-9 | 368-13900 | 0.057" | 0.8" |
2023-07-30 | C-10 | 244-16200 | 0.042" | 0.5" |
2023-08-20 | C-9 | 368-13900 | 0.057" | 0.8" |
2023-09-10 | C-8 | 110-8500 | 0.096" | 1.4" |
1NOTE: The Configuration Schedule is SUBJECT TO CHANGE.